> ## Documentation Index
> Fetch the complete documentation index at: https://developers.techwolf.ai/llms.txt
> Use this file to discover all available pages before exploring further.

# How To: Set Up a Report Schedule

<Steps>
  <Step title="Navigate to report center">
    Search for `Go to Reports Center`, and navigate to the Reports Center.

    <Frame>
      <img src="https://mintcdn.com/techwolf/l5Opy3H2R3whFQiJ/integrations/datasource-integrations/sap-standard-input-integration/step_by_step_images/1_reports_center_main_page.png?fit=max&auto=format&n=l5Opy3H2R3whFQiJ&q=85&s=4fcef98954020ecfe1661bda2786464f" alt="Reports Center main page" width="1851" height="1010" data-path="integrations/datasource-integrations/sap-standard-input-integration/step_by_step_images/1_reports_center_main_page.png" />
    </Frame>
  </Step>

  <Step title="Create new import">
    In the Report Center, click `Import`. Enter the name and description for
    the report.
  </Step>

  <Step title="Upload report definition (.sfr)">
    Then, click `Browse` and upload the report `.sfr` for the integration.
    Continue by confirming the import and click on `Import`.

    <Frame>
      <img src="https://mintcdn.com/techwolf/l5Opy3H2R3whFQiJ/integrations/datasource-integrations/sap-standard-input-integration/step_by_step_images/2_import_report_definition.png?fit=max&auto=format&n=l5Opy3H2R3whFQiJ&q=85&s=e1803dc5772d06277490ca0cc7b5ec1f" alt="Import pop-up window" width="1535" height="973" data-path="integrations/datasource-integrations/sap-standard-input-integration/step_by_step_images/2_import_report_definition.png" />
    </Frame>
  </Step>

  <Step title="Open the report scheduler">
    Close the import window, and find the report you just uploaded in the report center.
    Click the 3 dots on the right and select `New Schedule` to create a new schedule.

    <Frame>
      <img src="https://mintcdn.com/techwolf/l5Opy3H2R3whFQiJ/integrations/datasource-integrations/sap-standard-input-integration/step_by_step_images/3_create_new_schedule.png?fit=max&auto=format&n=l5Opy3H2R3whFQiJ&q=85&s=63a27108ca71a36c23a043ab1b8e0dcf" alt="Create a new schedule" width="546" height="485" data-path="integrations/datasource-integrations/sap-standard-input-integration/step_by_step_images/3_create_new_schedule.png" />
    </Frame>
  </Step>

  <Step title="Set name and format">
    Set the schedule name and report format.

    <Frame>
      <img src="https://mintcdn.com/techwolf/l5Opy3H2R3whFQiJ/integrations/datasource-integrations/sap-standard-input-integration/step_by_step_images/4_first_step_create_schedule.png?fit=max&auto=format&n=l5Opy3H2R3whFQiJ&q=85&s=1bbd5a6caf9a55fe2e33a18099df8378" alt="Step 1" width="1078" height="748" data-path="integrations/datasource-integrations/sap-standard-input-integration/step_by_step_images/4_first_step_create_schedule.png" />
    </Frame>
  </Step>

  <Step title="Setup SFTP">
    `Step 2`, filtering can be skipped. Continue to `Step 3`.
    In the Destination section choose `File Transfer Protocol (FTP)` as method.
    Fill in `Host Address`, `FTP Login` and `FTP Password` with the values received from TechWolf.
    Click `Test Connection` and `Test File Put Permission` to ensure that the connection is working.

    <Frame>
      <img src="https://mintcdn.com/techwolf/l5Opy3H2R3whFQiJ/integrations/datasource-integrations/sap-standard-input-integration/step_by_step_images/5_destination_settings_schedule.png?fit=max&auto=format&n=l5Opy3H2R3whFQiJ&q=85&s=59aa53d7234ed0e87e226006c132b454" alt="Step 3" width="940" height="646" data-path="integrations/datasource-integrations/sap-standard-input-integration/step_by_step_images/5_destination_settings_schedule.png" />
    </Frame>
  </Step>

  <Step title="Set file details">
    In the same section, fill in the file path and file name for the integration.
    Select `yyyyMMdd` as the date format. Click `Step 4`.
  </Step>

  <Step title="Set schedule">
    Under Schedule Occurrence, select `Recurring` in the dropdown menu. Then
    choose `Daily` under Recurring Pattern, and choose 12:00 AM tomorrow under
    `First Occurrence`. Set `Ending On` to a date far enough in the future and
    set up a reminder for yourself to extend the schedule when the expiry date
    is approaching.

    <Frame>
      <img src="https://mintcdn.com/techwolf/l5Opy3H2R3whFQiJ/integrations/datasource-integrations/sap-standard-input-integration/step_by_step_images/6_schedule_occurrence_settings.png?fit=max&auto=format&n=l5Opy3H2R3whFQiJ&q=85&s=0aee3462e7858705317ada6ba9afbbda" alt="Step 4: Schedule timing" width="641" height="582" data-path="integrations/datasource-integrations/sap-standard-input-integration/step_by_step_images/6_schedule_occurrence_settings.png" />
    </Frame>

    Finally, click `Submit`. The schedule is now live.
  </Step>
</Steps>
